Thames Water PPS Programme
We are currently working on the Thames Water PPS AMP 6 Programme completing Mechanical and Electrical upgrade works to the Small Private...
Ryan
Dec 17, 20181 min read


Affinity Water Fairfield Reservoir
We completed a new three pump booster pumping station installed at Fairfield where we provided a site manager on this project from the...
Ryan
Dec 17, 20181 min read


South East Water Blackhurst Tower
We carried out a decommissioning and strip out on an existing two pump booster pumping station at Blackhurst Tower, which was carried out...
Ryan
Dec 17, 20181 min read


Production Line LV Installation
We were asked to install a New Distribution Board to supply several control panels on a new production line. We also installed new...
Ryan
Dec 17, 20181 min read


Leathermarket Office Refurbishment
Works was a complete refurbishment of an existing office due to new tenants. It consisted of removal of existing Lighting, Small Power,...
ryanrob15
Dec 17, 20181 min read