top of page
Search


Thames Water PPS Programme
We are currently working on the Thames Water PPS AMP 6 Programme completing Mechanical and Electrical upgrade works to the Small Private...
Ryan
Dec 17, 20181 min read
36 views
0 comments


Affinity Water Fairfield Reservoir
We completed a new three pump booster pumping station installed at Fairfield where we provided a site manager on this project from the...
Ryan
Dec 17, 20181 min read
25 views
0 comments


South East Water Blackhurst Tower
We carried out a decommissioning and strip out on an existing two pump booster pumping station at Blackhurst Tower, which was carried out...
Ryan
Dec 17, 20181 min read
35 views
0 comments


Production Line LV Installation
We were asked to install a New Distribution Board to supply several control panels on a new production line. We also installed new...
Ryan
Dec 17, 20181 min read
15 views
0 comments


Leathermarket Office Refurbishment
Works was a complete refurbishment of an existing office due to new tenants. It consisted of removal of existing Lighting, Small Power,...
ryanrob15
Dec 17, 20181 min read
13 views
0 comments
bottom of page